PENGSHUN Showcased
Dongguan pengshun electromechanical Co., Ltd
Contact: Mr Ren
Mobile: 13688997595
E-mail:daniel@dgpengshun.com
Contact: Miss Yu
Mobile: 13590359548
Tel: 0769-82581698
Fax: 0769-82583077
E-mail:carrie@dgpenshun.com
Address: Room 101, Building 2, No. 14 Xinhe Shengfeng Road, Wanjiang Street, Dongguan City, Guangdong Province
★ Quality management
We believe that good quality is made, not tested. We integrate the quality awareness of all staff into the process of manufacturing products
Strict quality inspection standards have been established for every process, from raw material purchase to processing to final packaging and shipment,
And effective implementation, while using advanced quality management techniques, process quality control and error prevention in advance.
◆ Process operation instruction:
After receiving the order of each part, the engineer of the engineering department shall analyze the process first, and then prepare the process flow. The operator shall operate according to the process flow。
◆ Process guidance document: process drawing
When necessary, the engineering department shall make single process drawings, so that the operators and inspectors can grasp the quality key points more simply and spontaneously。
◆ Self inspection specification and self inspection:
QA of quality department makes self inspection specification, and operation personnel of production department self inspection and self inspection record。
◆ First inspection specification and first inspection:
QA of quality department shall formulate the first inspection specification, and ipqc of quality department shall record the first inspection and first inspection。
◆ Finished product inspection specification and finished product inspection:
QA of the quality department shall formulate the finished product inspection specifications, and FQC shall conduct sampling inspection and judgment according to AQL = 0.65 and IL = II standards, and conduct full sampling if it fails to meet the standards;
Material certificate and finished product test report shall be attached for each shipment
。
◆ Production site picture: